Public body / Data updated November 16, 2026 / 24 months, November 15, 2024 to November 16, 2026
Over 24 months, Hydro-Québec. accounts for 637 published tenders, or 0.5% of everything Adjulo tracks. 98% of these tenders are open tenders, compared with 32% overall; direct awards make up 1.4%. The median value of an awarded contract is $521,502, compared with $69,770 across all contracts published in Québec. 20 tenders are open today for this organization.
Open tenders
20 tenders are accepting bids today, listed by closing date.
/ closes today
Côte-Nord / Montagnais Substation - Replacement of T3 transformers and circuit breakers 700-11 and 700-12
Replacement of transformers T3 and circuit breakers 700-11 and 700-12 at the Montagnais substation on the Côte-Nord for Hydro-Québec. The work includes concrete foundations, steel structures, cable trenches, replacement of electrical equipment, busbars, cabling and fire system piping. Indicative order of magnitude between $5M and $10M.Summary generated by Maple AI
/ closes tomorrow
Laval / CA Michelin - Replacement of generator day tank
Replacement of a diesel day tank and transfer switch of an existing generator, including addition of a CAMLOCK connection, with all related electrical, mechanical, control, connection, testing and commissioning work, for Hydro-Québec in Laval (CA Michelin).Summary generated by Maple AI
/ closes tomorrow
Outaouais / Hull Administrative Centre - Cleaning, decontamination and painting of surfaces in the industrial area of the west block
Cleaning and decontamination of surfaces that may contain lead dust in the industrial workshops of the west block of the Hull Administrative Centre, followed by painting of the cleaned surfaces, without interrupting site operations. Estimated value: between $500,000 and $1,000,000.Summary generated by Maple AI
/ closes in 2 days
Provincial / Framework contract for civil engineering works at Hydro-Québec production facilities (≤ $2M)
Framework contract for the performance of civil engineering construction works and related work (specialized labour, materials, equipment and machinery) near or within Hydro-Québec production facilities in various regions of Quebec; each order is capped at $2,000,000, for an indicative value of $60,000,000 to $80,000,000.Summary generated by Maple AI
/ closes in 3 days
Nord-du-Québec / Quaqtaq Power Plant - Integration of Renewable Energies - Lot 2
Building, civil, electrical installation and control/telecommunication works to integrate renewable energy at the Quaqtaq power plant in Nord-du-Québec, for Hydro-Québec. Indicative order of magnitude between $3,000,000 and $5,000,000.Summary generated by Maple AI
/ closes in 4 days
Gaspésie–Îles-de-la-Madeleine / Centrale thermique Cap-aux-Meules - Peinture des réservoirs
Cleaning, surface preparation and painting of the fuel tank farm at the Cap-aux-Meules thermal power plant in the Îles-de-la-Madeleine, for Hydro-Québec, with an indicative order of magnitude of $5,000,000 to $10,000,000.Summary generated by Maple AI
/ closes in 4 days
Montérégie / Varennes / Supply of an Inductive Load Bank
Supply of an inductive load bank for Hydro-Québec, in Varennes (Montérégie). The indicative order of magnitude, options included, is estimated between $100,000 and $500,000, without commitment from Hydro-Québec.Summary generated by Maple AI
/ closes in 7 days
Multi-regions – Supply and installation of residential wall-mounted heat pumps - Phase 2
Hydro-Québec is seeking the supply, installation and commissioning of residential wall-mounted heat pumps (phase 2) across multiple regions, including feasibility visits, warranties and after-sales service for program participants. Indicative order of magnitude: $40M to $60M, options included.Summary generated by Maple AI
/ closes in 8 days
Montréal and Laval - Stump Removal
On-demand stump removal services within Hydro-Québec transmission line rights-of-way in Montréal and Laval, under lump-sum terms. Indicative order of magnitude between $500,000 and $1,000,000, options included.Summary generated by Maple AI
/ closes in 8 days
Multiple regions / Insulator replacement - 2027 work on 315 kV and 735 kV circuits
Replacement of insulators and certain accessories on 315 kV and 735 kV circuits across several regions, for Hydro-Québec, with work planned for 2027. Indicative order of magnitude between CAD 60M and CAD 80M.Summary generated by Maple AI
/ closes in 8 days
Provincial - On-demand trainer services for dissemination of vehicle electrical function inspection
On-demand trainer services for training in inspecting electrical functions on vehicles, for Hydro-Québec mechanics, aimed at understanding, inspecting, preventive diagnosis and repair of electrical systems in the fleet of vehicles. Indicative order of magnitude including options: between $100,000 and $500,000.Summary generated by Maple AI
/ closes in 11 days
Montreal / Hochelaga - Notre-Dame - 315 kV Underground Conduit - L3212 and L3213 LOT 2
Hydro-Québec is tendering the construction of underground conduits for lines 3212 and 3213 between the Notre-Dame and Hochelaga substations in Montreal, in two lots (2A and 2B), with an indicative value of $10M to $20M.Summary generated by Maple AI
/ closes in 14 days
Laurentides / CA Blainville - Exterior Cladding Rehabilitation
Replacement of the exterior cladding and recovery of the masonry at the Blainville CA (Laurentides), including replacement of exterior sprinkler outlets and installation of a mobile generator connection, for Hydro-Québec.Summary generated by Maple AI
/ closes in 18 days
Nord-du-Québec / Némiscau Substation - Civil and electrical works on power transformers, shunt reactors, other equipment and related works
Civil and electrical works at the Némiscau substation (Nord-du-Québec): power transformers, shunt reactors, other equipment and related works, including building, foundations, cabling and dismantling of the compressed air system for Hydro-Québec.Summary generated by Maple AI
/ closes in 18 days
Montérégie / IREQ - High Voltage Laboratory - Replacement of a chiller with an air-source heat pump works
Replacement of the chiller serving blocks A, C and D of the High Voltage Laboratory at IREQ (Montérégie) with a high-efficiency reversible air-to-water heat pump, including dismantling, glycol loop adaptation, electrical upgrade and building management system integration, while maintaining building services.Summary generated by Maple AI
Show the other 5 tenders
/ closes in 21 days
Provincial - Disposal of contaminated soils or residual granular materials from Hydro-Québec installations
From 2027 to 2029, Hydro-Québec plans to manage more than 20,000 tonnes per year of contaminated soils and residual granular materials from its installations in Quebec: characterization, treatment, recovery, disposal or temporary storage, including contaminated, asbestos-containing and uncharacterized soils. Indicative value between $10M and $20M.Summary generated by Maple AI
/ closes in 25 days
Côte-Nord / Micoua Substation - Replacement of Transformer T4 and Related Work
/ closes in 32 days
Montreal / Des Sources Substation (315-25 kV) - Sustainability and Upgrade Works
/ closes in 65 days
Montérégie / Pierre-Laporte Substation - Construction of a New 230 kV Switching Station
/ closes in 66 days
ECI Construction of the new 315-25 kV Toupin and Souligny substations
New Québec tenders are released as open data once a week: they arrive every Monday around 7 a.m. Federal tenders arrive Monday to Friday around 8 a.m. Every day, all open tenders are re-evaluated: those past their closing date close, and closing dates extended by addendum are recalculated.
Only the official tender, published by the source, is authoritative.
Procurement profile
Tenders from this organization focus first on these sectors: Building and facility maintenance and repair services (11%), General building construction (9.6%) and Heavy construction services (7.8%). Contract amounts awarded by this organization mostly fall between $115,052 and $2.9M, the middle half of contracts.
The five most frequent suppliers won 8.2% of the 2,065 contracts with an identified supplier, shared among 899 suppliers.
Publications follow no season that repeats each year; they range from 15 to 43 tenders a month. 307 tenders in 12 months, compared with 330 the year before: a similar volume.
Activity
637 tenders published in 24 months, including 254 in 2026. 2,070 contracts awarded, worth $9B; the median contract is $521,502.
Chart data
| Quarter | Tenders — Québec | Contracts awarded | Value |
|---|---|---|---|
| 2024 Q4 | 42 | 80 | $571.9M |
| 2025 Q1 | 68 | 402 | $844.7M |
| 2025 Q2 | 100 | 176 | $2.6B |
| 2025 Q3 | 79 | 592 | $304.5M |
| 2025 Q4 | 94 | 264 | $864.2M |
| 2026 Q1 | 83 | 250 | $778.6M |
| 2026 Q2 | 81 | 207 | $2.4B |
| 2026 Q3 | 63 | 91 | $693.4M |
| 2026 Q4 | 27 | 8 | $3M |
Awarding
- Open tender624 / 98%
- By invitation4 / 0.6%
- Direct award9 / 1.4%
Market links
Main sectors
- Building and facility maintenance and repair services61 tenders
- General building construction53 tenders
- Heavy construction services43 tenders
- Nonresidential building construction services31 tenders
- Manufacturing technologies27 tenders
- Specialized trade construction and maintenance services27 tenders
- Horticulture25 tenders
- Cleaning and janitorial services23 tenders
- Permanent structures20 tenders
- Software12 tenders
Suppliers
| Company | Contracts |
|---|---|
| ENTREPRISES RODRIGUE PIQUETTE INC. | 6 |
| NORMANDIN BEAUDRY, ACTUAIRES CONSEIL INC. | 2 |
| SIGNALÉTIK INC. | 2 |
3 of the 790 companies awarded contracts by this organization over 24 months, picked at random. Subscribers see the full list, with the amounts awarded to each, their won and lost bids, and their head-to-heads with competitors. See plans
Comparable organizations
- Société des traversiers du Québec857 contracts
- Société des établissements de plein air du Québec (Sépaq).924 contracts
- Revenu Québec515 contracts
- Société québécoise des infrastructures632 contracts
- Société de l'assurance automobile du Québec .433 contracts
- Société d'habitation et de développement de Montréal276 contracts
Frequently asked questions
- Hydro-Québec.: how many tenders are published?
- 637 tenders in 24 months, or about 27 a month. 307 of them in the last 12 months.
- Hydro-Québec.: which sectors are the most active?
- Three sectors lead the tenders of this organization: Building and facility maintenance and repair services (11%), General building construction (9.6%) and Heavy construction services (7.8%). Shares are computed on tenders classified by sector, over 24 months.
- Hydro-Québec.: how many tenders are open today?
- 20 tenders were accepting bids on November 16, 2026. They are listed on this page by closing date, with a link to the official notice.
- What is the difference between an open tender, a selective tender and a direct award?
- An open tender is open to any company that meets the conditions of the notice. A selective or invitation-only tender is limited to companies that are pre-qualified or invited by the organization. A direct award is a contract concluded directly with a supplier, without competition, in the cases the rules allow. For this organization: 98% open tenders and 1.4% direct awards, over 24 months.
- Hydro-Québec.: what is a typical contract worth?
- The median contract is worth $521,502. Half of the contracts awarded by this organization are worth between $115,052 and $2.9M. Based on 2,070 contracts awarded over 24 months.